Hello everyone!
The long-awaited production update is finally here!
Just like in December, we are seeing steady progress in our deliveries. Our oldest references are being shipped regularly and most of them are nearing completion. The two most challenging pieces remain Blackbeard UHQS and Naruto MUB, mainly due to their sheer volume and the space they occupy, both on the production lines and from a logistical standpoint. However, we can finally see the light at the end of the tunnel, and everyone will soon be able to enjoy these masterpieces.
As for our newer references, we are overall on track with the announced schedules, maintaining the stability we've established over the past few months. A great number of productions are either completed or on the verge of completion. From there, it is simply a matter of logistics and container shipping.
Below you will find individual updates sorted by license and reference. A detailed summary table is also available at the end of this article.
If the reference you are looking for is not listed below, it means its production is fully completed and the piece is already available in our warehouses.

BARDOCK HQSDX
Pre-production is still ongoing.
We expect a slight delay for the start of shipments in order to fully optimize the piece's engineering during production.
COOLER - MOVIE COLLECTION
Deliveries are currently starting in Asia and will begin this quarter in Europe.Shipments will wrap up in Q3. Please note that this BIJUtsu comes in 2 boxes: one for Cooler and one for the waterfall.
GOGETA BIJUTSU
We are currently waiting for the T1 sample, expected by the end of this month.The dates indicated on the product page remain unchanged.
SON GOKU SSJ HQSDX
Production is completed. The final shipments are scheduled for the end of Q2.


FINAL BATTLE: IZUKU MIDORIYA VS TOMURA SHIGARAKI HQSDX
Pre-production is underway. Shipments are scheduled to begin in Q1 2027.
STAIN IKIGAI
We validated the final sample in April during our factory visits in China.Shipments will begin at the end of this summer.


HARLEY QUINN UHQS
Production is underway. Shipments will start at the end of Q2 and will conclude this summer.
THE JOKER HQSDX
Production is completed; we are currently awaiting the final container.


BLACKBEARD UHQS
Production is wrapping up. Shipments are being processed in small batches due to the massive size of the packaging.
BUGGY HQSDX
Production is completed. Shipments will conclude this quarter.
CARROT IKIGAI
The first batch arrived, but it did not pass Quality Control (QC) due to breakages found on Carrot's head. The second batch has been adjusted, and we are currently waiting for the replacement parts and the release of the full batch.
CHOPPER IKIGAI
Pre-production is underway.Shipments are still on schedule according to the date indicated on the product page.
LUFFY MUB
Production is completed. Shipments will conclude this quarter.
LUFFY BIJUTSU
Production is underway.Shipments are still on schedule according to the date indicated on the product page.
NAMI IKIGAI
Production is underway. Shipments will begin at the end of Q2.
SANJI BIJUTSU
Production is completed. Shipments will conclude this quarter.
ZORO BIJUTSU
Production is almost completed. Shipments will wrap up at the beginning of Q3.


GRAY IKIGAI
The sample is expected by the end of this month. Shipments will begin in Q3..
JUVIA IKIGAI
The sample is expected by the end of this month. Shipments will begin in Q3.


JIRAIYA BIJUTSU
La production est en cours.
Les envois débuteront début du 3eme trimestre en Asie dans la foulée en Europe.


DEIDARA IKIGAI
The sample is expected by the end of this month. Shipments will begin in Q3.
KISAME HQS
Production is wrapping up. Shipments will conclude at the beginning of Q3.
OBITO UCHIHA UHQS et HQSDX
Production is underway. Shipments are expected to begin at the early stage of Q3. This slight delay is due to the engineering required for the screen on the UHQS version.
SASORI IKIGAI
The sample is expected by the end of this month. Shipments will begin in Q3.


NARUTO MUB
Production is underway and almost completed. Shipments will continue in batches until Q3 due to the massive size of the MUB packaging (3 boxes).


APHRODITE HQS
Production is completed. Shipments will begin at the end of this quarter and will wrap up in Q3.
ARIES MU HQS
Production is completed. Shipments will conclude in Q3.
HYOGA GOD CLOTH IKIGAI
Shipments will begin according to the estimated date shown on the website..
SEIYA MUB
Production is underway. Shipments have started in Asia, and the first batch is expected in Europe between late Q2 and early Q3.


OKARUN IKIGAI
Production is underway. Shipments will begin at the end of Q2 in Asia and during Q3 in Europe.
MOMO IKIGAI
Pre-production is underway. Shipments will begin according to the estimated date shown on the website.


ULYSSE IKIGAI
Pre-production is underway. Shipments will begin according to the estimated date shown on the website.
ULYSSE MUB
Pre-production is underway. Shipments will begin according to the estimated date shown on the website.

GRIMMJOW IKIGAI
Production is completed. Shipments will conclude between the end of this quarter and the beginning of Q3.
KENPACHI IKIGAI
We are currently waiting for feedback from the licensors regarding the new head sculpt. We will provide an update as soon as we receive their answer, whether positive or negative. Delivery estimates remain unchanged for now.

SHUNSUI BIJUTSU
We are currently waiting for the validation sample. Shipments will begin between late Q3 and early Q4.

INOSUKE IKIGAI
Pre-production is underway. Shipments will begin according to the estimated date shown on the website.
NEZUKO IKIGAI
Production is completed. Shipments will continue until the beginning of Q3.

GRENDIZER MUB
Shipments will begin according to the estimated date shown on the website.

COBRA IKIGAI
Pre-production is underway. Shipments will begin according to the estimated date shown on the website.
COBRA MUB
Pre-production is underway. Shipments will begin according to the estimated date shown on the website.
To wrap things up, here is the estimated shipping schedule breakdown by quarter.
Finally, here is the table of estimated shipments for each quarter.